P2P: Signal controller to apply blocks if sync interrupted #5011
Triggered via pull request
December 5, 2025 15:51
Status
Cancelled
Total duration
1d 0h 0m 20s
Artifacts
–
build.yaml
on: pull_request
Discover Versions
4s
Platform Cache
/
Discover Platforms
6s
Matrix: Platform Cache / Build Platforms
Matrix: Run Build Workflow / Build spring
Matrix: np-tests
Matrix: Build deb packages
Matrix: tests
Matrix: lr-tests
Matrix: libtester tests
All Required Tests Passed
2s
Annotations
7 errors
|
Run Build Workflow / Build spring (ubsan)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|
|
Run Build Workflow / Build spring (ubuntu22)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|
|
Run Build Workflow / Build spring (ubuntu20)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|
|
Run Build Workflow / Build spring (asserton)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|
|
Run Build Workflow / Build spring (reproducible)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|
|
Run Build Workflow / Build spring (asan)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|
|
All Required Tests Passed
Process completed with exit code 1.
|