Skip to content

Mismatch in calendar when using a temporal perturbation on the "experiment" calendar. #69

@mpudig

Description

@mpudig

I am experiencing a slow-down in my ACCESS-OM2-1 simulations when applying a time-dependent, spatially constant perturbation.

However, the slow-down appears only to arise when I start from a spun-up control simulation. When I start from a cold start, my simulation runs fine (finishing 1 year in ~14 minutes wall time). Whereas when I start from a spun-up control simulation (starting at model year 2100) my simulation runs fine until it experiences a dramatic slow-down at around 2100-11-10 (finishing 1 year in ~1 hr wall time).

The cold-start run can be found at /home/561/mp2135/access-om2/1deg_jra55_ryf_wcwc_test1 and the run experiencing the slow-down can be found at /home/561/mp2135/access-om2/1deg_jra55_ryf_wcwc_test2. The only difference between the two is that test2 is branched from a spin-up.

There has been some previous discussion in this thread on Slack https://arccss.slack.com/archives/C08KM5KS6/p1625456199042400.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions