Skip to content

BWE, Project Milestones #4

@ForrestErickson

Description

@ForrestErickson

This project milestones

From start of design to first production.

  • Product Functional Specification Released.
  • Proof of concept, sketches, drawings, mock-ups, bread boards and wishful thinking.
  • Schematics and drawings for all parts in folders, electrical and mechanical.
  • Test points for manufacturing / troubleshooting especially for power.
  • Update parts master to assign Part Numbers
  • Schematic release V0.0.1 for initial review
  • Review for manufacturing, testing, loading firmware, EMC, signal integrity, power distribution, safety, maximum temperature, etc...
  • Update Schematic release V0.0.2 etc...
  • Setup PCB software or train self for PCB manufacturing design rules.
  • Schematic approved for start of PCB layout V0.1.xx Passes schematic design rules check.
  • Assign and place PCB part number on PCB silk screen.
  • Assign and place PCB version number on PCB silk screen.
  • Place on the PCB silk screen a location for Serial Number to be applied at start of manufacture.
  • Place on the PCB silk screen a logo.
  • Place on the PCB silk screen a license or statement of copywrite.
  • Enclosure design review. (Make card board mock up, Cable mock up. PCB mock up.) Make sure of clearance around all mounting hardware for screw / nut drivers.
  • Enclosure design freeze for prototype PCB. PCB outline and connector placement freeze.
  • PCB outline import parts and make and connector placement. Make mock up for fit to enclosure
  • Milestone: PCB mechanical fit test, (PCB mock up with connector fits enclosure with cables etc...)
  • Component placement for optimum routing and heat and Electromagnetic compatibility. Then route.
  • Connect through hole component traces to "teardrop" pads for strength. Route so that traces can be inspected (Not under connectors for example).
  • PCB passes DRC (Design rules check).
  • Review of Gerbers and other files by fabricator of PCB against design rules.
  • Inventory and order parts including PCB and stencils.
  • Make CAD files (STEP or other) of PCB and Enclosure and test fit in an assembly. Reivew and specify any required changes.
  • Build Prototype Enclosure and printed wirring assembly(s)
  • Assemble first unit(s) and engineering and compliance (Safty, EMC, other) test.
  • Engineering revise and release for rest of Prototype Run. Update of engineering, sales, legal documentation with photographs measurements of real hardware.
  • Firmware code review and release.
  • Factory Test in place.
  • Changes and repeat all the above for Pilot Run (First selleable units with serial numbers etc).

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions