-
Notifications
You must be signed in to change notification settings - Fork 4
Open
Milestone
Description
Phase 1: Preparation & Sourcing
- 20250828 Order tabletop tripod for better photos (Amazon, $30)
- 20250828 Order more 10-pin headers (Amazon, $8)
- Order New Keycaps (6x6mm) - Digi-Key, Mouser? (~$18)
- Mail to Lee and Robert upon arrival
- Gather all Components for photoshoot
- Verify every part (PCBs, screws, resistors, 3D-printed parts) is on hand
- Ask @ForrestErickson to 3D print parts
- Controller enclosure
- Interior Petrifilm holder
- Interior heaterboard tray
- Confirm print settings for reproducibility
Phase 2: Documentation Capture
- Take high-quality exploded view photo
- All components laid out neatly on a neutral background
- Take Step-by-Step Assembly Photos for each major step
- Soldering headers
- Mounting heater board
- Inserting Petrifilm holder
- TK
- Record short video clips of complicated assembly steps (for Github)
- Organize all assets in a
assembly_moonratII/folder- Rename files descriptively
Phase 3: Documentation Authoring
- Create
assembly_moonratII.mdfile in the repository root - Draft instructions for each step:
- Describe the action clearly
- List all parts and tools needed for that step
- Reference the corresponding photo/video
- Note any warnings or easy-to-make mistakes
- Tools Required section
- Link to the final BOM
Phase 4: Review & Integration
- Have another team member attempt build using only the instructions
- Check for spelling, grammar, and consistent phrasing
- Ensure assembly steps in paper match
assembly_moonratII.md - Finalize repo structure and ensure all docs are committed
Reactions are currently unavailable
Metadata
Metadata
Assignees
Labels
No labels