On the Active Blocks page, when calculating the assigned percentage schedules based vehicles (created by the SchedBasedPredsModule) are taken into account but the number of assigned vehicles does not include these.
I am not sure if the intention is to include them or not in the totals/percentage but I expect it should be consistent?