Skip to content

chore(deps): update jest monorepo to v30 #1822

chore(deps): update jest monorepo to v30

chore(deps): update jest monorepo to v30 #1822

Triggered via push October 21, 2025 23:55
Status Failure
Total duration 58s
Artifacts

docker.yml

on: push
Matrix: build
Deploy (CD)
0s
Deploy (CD)
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Build (postgres)
buildx failed with: ERROR: failed to build: failed to solve: process "/bin/sh -c pip install -r requirements.txt" did not complete successfully: exit code: 1
Build (frontend)
The strategy configuration was canceled because "build.postgres" failed
Build (frontend)
The operation was canceled.
Build (next)
The strategy configuration was canceled because "build.postgres" failed
Build (next)
The operation was canceled.
Build (backend)
The strategy configuration was canceled because "build.postgres" failed
Build (backend)
The operation was canceled.