Skip to content

Plumb timeout from --timeout through MeshInterface #1570

Plumb timeout from --timeout through MeshInterface

Plumb timeout from --timeout through MeshInterface #1570

Re-run triggered October 13, 2025 16:20
Status Failure
Total duration 26m 10s
Artifacts

ci.yml

on: pull_request
Matrix: build
Matrix: validate
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 6 warnings
build (3.12)
Process completed with exit code 24.
build (3.10)
The strategy configuration was canceled because "build._3_12" failed
build (3.9)
The strategy configuration was canceled because "build._3_12" failed
build (3.11)
The operation was canceled.
build (3.11)
The strategy configuration was canceled because "build._3_12" failed
build (3.12)
The `python-version` input is not set. The version of Python currently in `PATH` will be used.
build (3.11)
The `python-version` input is not set. The version of Python currently in `PATH` will be used.
validate (3.10)
The `python-version` input is not set. The version of Python currently in `PATH` will be used.
validate (3.9)
The `python-version` input is not set. The version of Python currently in `PATH` will be used.
validate (3.11)
The `python-version` input is not set. The version of Python currently in `PATH` will be used.
validate (3.12)
The `python-version` input is not set. The version of Python currently in `PATH` will be used.