Tests #10
tests.yml
on: schedule
Matrix: test
Lint with pre-commit
9s
Build package
0s
Annotations
8 errors
|
Lint with pre-commit
Process completed with exit code 1.
|
|
Test on Python 3.11
Process completed with exit code 4.
|
|
Test on Python 3.9
The operation was canceled.
|
|
Test on Python 3.9
The strategy configuration was canceled because "test._3_11" failed
|
|
Test on Python 3.10
The operation was canceled.
|
|
Test on Python 3.10
The strategy configuration was canceled because "test._3_11" failed
|
|
Test on Python 3.12
The operation was canceled.
|
|
Test on Python 3.12
The strategy configuration was canceled because "test._3_11" failed
|