A Python-based production planning system for optimizing manufacturing operations. The system uses Mixed-Integer Linear Programming to minimize makespan while respecting machine capabilities, material availability, and operational constraints.
- Production Optimization: MILP-based task assignment to minimize total production time
- Energy Consumption: Calculates energy usage based on machine power profiles (idle, loading, production)
- Realistic Time Modeling: Accounts for machine working hours, (un)loading time, batch capacities
- Data Generation: Built-in random factory data generator for testing and simulation
- Yield Rate Handling: Considers production waste and calculates actual quantities needed
project_work/
├── src/
│ ├── data/ # Static production data (materials, recipes, machines, orders)
│ ├── entities/ # Domain models (Machine, Recipe, Order, etc.)
│ ├── generator/ # Random data generator
│ ├── loader/ # Data loading and validation
│ ├── planner/ # Production planning and optimization
│ ├── schemas.py # Pydantic validation schemas
│ └── main.py # Entry point
└── README.md
- Python 3.12+
- pip
- Create and activate a virtual environment (recommended):
python3 -m venv venv
source venv/bin/activate # On Windows: venv\Scripts\activate- Install dependencies:
pip install -r src/requirements.txtUse data from src/data/:
python3 -m src.mainGenerate random factory data and run the planner:
python3 -m src.main -gOr specify the number of entities to generate:
python3 -m src.main -g --materials 10 --recipes 5 --machines 3 --orders 2 --min-quantity 200-g, --generate: Generate random data before running the planner--materials N: Number of materials to generate (default: random 5-15)--recipes N: Number of recipes to generate (default: random 3-10)--machines N: Number of machines to generate (default: random 2-5)--orders N: Number of orders to generate (default: random 1-3)--min-quantity X: Minimum quantity for each recipe in orders (default: 50 for pieces, 5.0 for kg/L)
The planner produces a production schedule showing:
- Production assignments: Which machine produces which recipe
- Time estimates: Individual task times and overall makespan
- Energy consumption: KWh consumption per task and total
- Material validation: Stock availability checks
Example output:
PRODUCTION PLANNING
================================================================================
MACHINE: Packaging Unit A
--------------------------------------------------------------------------------
RECIPE: Butter Biscuits
- Quantity: 1500 pieces
- Time: 1068.00 seconds (17.80 minutes)
- Energy: 2739.6000 KWh
================================================================================
TOTAL ENERGY CONSUMPTION: 2739.6000 KWh
TOTAL WORK TIME (all machines): 1068.00 seconds (17.80 minutes)
MAKESPAN (calendar time): 1068.00 seconds (17.80 minutes)
================================================================================
- Makespan: Total calendar time to complete all production (max of all machine times)
- Yield Rate: Percentage of good output vs. raw production (affects material requirements)
- Batch Capacity: Maximum quantity a machine can process in one batch
- Power Profile: Machine energy consumption at different states (idle, loading, producing)
- Max Working Hours: Daily operational limit for each machine
pydantic: Data validation and settings managementpulp: Linear programming and optimization- Additional dependencies listed in