Fix JSON formatting when POST date type.#71
Fix JSON formatting when POST date type.#71julyclyde wants to merge 1 commit intogetsentry:masterfrom
Conversation
old fashion would post duedate field as
"duedate": {"id": "2015-07-31"}
but Jira refused it: "Operation value must be a string"
this commit fix the formatting. Tested on Jira 6.4.4
|
Is anyone responsible for this? |
|
@julyclyde We (Sentry) haven't had time to verify this fix, which is why we didn't get around to merging it. It definitely looks good at a glance, but we're trying to be a bit more strict about stability on our integrations. |
|
This seems to be a problem still. We just added the due date field as a required field on some of our projects but we cant use the sentry integration to open any tickets because the "Operation value must be a string" error is still happening. |
|
Is there any progress on an issue? |
|
@ojomio this plugin is mostly unmaintained. The organization level integration in the main sentry repository is where the sentry team is putting any future effort. |
|
@markstory, does it mean community version will never get it fixed? |
|
@ojomio The jira integration works in on-premise as well. |
old fashion would post duedate field as
"duedate": {"id": "2015-07-31"}
but Jira refused it: "Operation value must be a string"
this commit fix the formatting. Tested on Jira 6.4.4