chore(deps): update konflux references #1715
Merged
Red Hat Konflux / Red Hat Konflux / acs-enterprise-contract-4-6 / pr group
failed
Jul 8, 2025 in 3m 55s
Failed
Integration test for snapshot acs-4-6-xm2ls and scenario acs-enterprise-contract-4-6 has failed
Details
- Pipelinerun: acs-enterprise-contract-4-6-5n2bd
| Task | Duration | Test Suite | Status | Details |
|---|---|---|---|---|
| verify | 3m51s | ❌ FAILURE | ✔️ 5377 success(es) ❌ 880 failure(s) |
The group snapshot is generated for pr group konflux/references/release-2.35 and the component snasphots as below:
| Component | Snapshot | BuildPipelineRun | PullRequest |
|---|---|---|---|
| scanner-db-4-6 | acs-4-6-8kcwb | scanner-db-on-push-4g24k | scanner |
| scanner-4-6 | acs-4-6-t7kfz | scanner-on-push-m6shn | scanner |
| scanner-db-slim-4-6 | acs-4-6-dxdg9 | scanner-db-slim-on-push-m885l | scanner |
| scanner-slim-4-6 | acs-4-6-hhkrw | scanner-slim-on-push-xgkxb | scanner |
Loading